Following a river overflow event, a movable bridge project has been developed in order to ensure the pedestrian linking and the safety of the steel bridge itself in the event of future overflows.
In cooperation with a partner engineering company, the scope of works included the supply, fabrication and installation of an oleodynamic system complete of controls equipment to lift the bridge 4,50m above the water level.